Solar Panels: 20 Ways to Tell If Your Solar Company Is Legit is a checklist to take to your next solar sales appointment. Before you sign, make the company show three things: who will do the work, what you will really pay, and who will pick up the phone after the install.


Check an item only when you have evidence. Unanswered questions need follow-up. False documents or pressure to skip verification mean stop.


Solar panels installed on the shingled roofs of residential homes.
Residential rooftop solar. U.S. Air Force photo by Roland Balik; public domain. Illustrative image, not a Fidelis installation.

The appearance of U.S. Department of War (DoW) visual information does not imply or constitute DoW endorsement.


1. Verify the people selling your solar panels


☐ 1. Match the company to the contract


Request: Ask for the legal business name on the installation agreement, its business address, and the name receiving your deposit. Compare those three places before paying; a trade name can be legitimate, but the relationship should be explained in writing.


Check: Confirm who is obligated to finish the job if the salesperson leaves. A lender, equipment manufacturer and installer may be different companies with different responsibilities.


Red flag: Payment goes to an unrelated person or business, and nobody will explain why.


☐ 2. Verify the required license


Request: Request the license holder’s name, license type, issuing authority and current status. Ask the city or county permitting office which credentials apply to the work at your address, then check the named contractor against that requirement.


Check: Read the scope, not just the expiration date. A credential for one trade or jurisdiction is not proof that the company can perform every part of your project. Manufacturer training and professional certification are separate checks.


Red flag: The company offers a training certificate but will not identify the contractor pulling the electrical permit.


Local example: Johnson County’s contractor lookup lets you check the named contractor. Verify the applicable trade rather than treating a certification logo as a license.


Requirements vary. The FTC’s solar buying guide explains jurisdiction-specific checks.


☐ 3. Check insurance independently


Request: Request a current certificate of insurance and the issuing agent’s contact information. Compare the named insured with your contractor, and ask the agent to confirm the document and relevant coverage. A certificate is evidence to investigate, not a promise that every loss is covered.


Check: Ask how subcontractor coverage and worker injuries are handled. Resolve any mismatch before crews begin work; do not wait until someone damages the roof.


Red flag: The document expired, names another company, or cannot be confirmed through an independently verified insurance contact.


☐ 4. Identify the installation crew


Request: Ask who performs the roof attachments, electrical work and commissioning. Have the installer identify its project supervisor and explain which portions it subcontracts, including who remains accountable to you.


Check: Use a practical question: if the roofer says an attachment leaked and the electrician says it is not their work, who owns the response? Subcontracting itself is not the problem; unclear responsibility is.


Red flag: The seller promises an in-house crew but the agreement allows unidentified parties to handle everything without a clear responsible contact.


☐ 5. Look beyond the star rating


Request: Request references for completed projects with similar roofs or equipment, including one customer who needed service. Ask whether the final price matched the contract, how inspection corrections were handled, and whether service calls were returned.


Check: Read the substance and timing of complaints, not just the average rating. A recurring account of unfinished utility paperwork deserves more attention than a vague five-star sales review posted before installation.


Red flag: Multiple customers describe the same unresolved problem and the company cannot explain what changed.


The Department of Energy’s installer-selection guide covers these checks. Apply them to us, too: compare our company information with our BBB business profile.


Two installers position a solar module above roof-mounted rails on a New Jersey home.
Installers position a rooftop solar module in New Jersey. U.S. Air Force photo by Pascual Flores; public domain. Illustrative image, not a Fidelis installation.

2. Check the design before believing the savings


☐ 6. Make sure they used your actual electricity usage


Request: Ask for the usage worksheet behind the proposal, preferably covering a full year of kilowatt-hours, not just dollars. Compare its annual total with your bills and flag missing months or estimated readings.


Check: Tell the designer about planned electric vehicles, heating changes or an addition. Have those future loads listed separately so you can distinguish measured consumption from assumptions. A larger system is not automatically a better investment.


Red flag: The proposal treats a low-use spring bill as representative of your entire year without explaining the adjustment.


☐ 7. Ask how they evaluated the roof


Request: Request a roof assessment, shade analysis and proposed panel layout. Ask how roof condition, attachment locations and any required structural review were evaluated, and which roof repairs must happen before installation.


Check: A satellite layout is a useful starting point, not an answer to every construction question. Ask who pays if the site assessment reveals work that was excluded from the initial price.


Red flag: The final scope assumes a clear roof even though visible trees, aging shingles or a planned reroof remain unresolved.


Compare the proposal with our property suitability guide. DOE also explains why roof condition and sunlight matter before installation.


☐ 8. Get the equipment in writing


Request: Ask for model numbers and quantities for panels, inverters and any batteries, plus the installation scope. Check whether monitoring, required electrical work and commissioning are included or priced separately.


Check: For substitutions, require a written approval process rather than relying on “equivalent equipment.” Compare the changed model’s warranty, capacity and compatibility. If outage backup matters, have the proposal identify the equipment and circuits actually supported during an outage.


Red flag: The contract names only a panel brand, while the salesperson’s backup-power promise appears nowhere in the equipment schedule.


If you’re comparing scopes, our residential services page shows what we handle, from solar to batteries and electrical work.


☐ 9. Separate production estimates from guarantees


Request: Request the production report showing annual kilowatt-hours, roof orientations, shade assumptions and modeled losses. Check that the report describes the equipment and layout you are actually buying. System size in kilowatts is not annual energy production.


Check: If there is a production guarantee, find the measurement period, exclusions, reporting deadline and remedy. Ask what happens after a weak production year and who must prove the shortfall.


Red flag: A projected output number is called guaranteed, but the contract provides no measurement method or remedy.


☐ 10. Check the utility math


Request: Ask for the utility tariff or program used in the proposal. Identify the rate assumed for electricity used at home, the credit for exported electricity, and charges that remain. Ask how time-of-use rates or export limits change the calculation.


Check: Illustrative example only: 10,000 kWh produced, with 6,000 used at home at an assumed $0.15/kWh and 4,000 exported at $0.05/kWh, yields $1,100 in gross annual energy value, not $1,500. This excludes fixed charges, financing, maintenance and rate changes; actual utility rules may work differently.


Red flag: Every solar kilowatt-hour is valued at the full retail rate even though the applicable export arrangement pays less.


3. Follow the money through the entire agreement


☐ 11. Compare the cash price and financed price


Request: Request separate cash and financed quotes for identical equipment and scope, along with the lender’s disclosures. Compare the contract price, amount financed, finance charge and total payments, not just the advertised interest rate.


Check: Hypothetical example: a $30,000 cash quote and a $39,000 financed price differ by $9,000 before scheduled interest. Ask what explains that difference. Do not assume the entire difference is a fee unless the documents establish it.


Red flag: The monthly payment is highlighted, but the seller will not provide a same-scope cash price or explain the amount borrowed.


☐ 12. Read every payment change


Request: Read the payment schedule in the loan documents. Highlight introductory payments, any required or assumed lump-sum prepayment, its due date, and what the payment becomes if you do not make it.


Check: For example, a hypothetical $160 payment that rises to $220 adds $60 per month, or $720 per year. Have the lender show your actual schedule with and without the assumed prepayment. Compare both against your budget, without counting an unconfirmed rebate or tax benefit.


Red flag: The salesperson describes one payment as permanent while the signed schedule contains a higher later payment.


The CFPB’s solar-financing report documents concerns about embedded fees, payment increases and overstated savings. It is a 2024 report, not a statement of today’s incentive eligibility.


☐ 13. Verify incentives separately


Request: Ask for the incentive’s official program name, administrator, current rules and application deadline. Establish who applies, who receives the benefit, and whether funding, reservation, inspection or installation timing affects eligibility.


Check: Keep proposed incentives separate from the amount you owe. Ask for the project economics without any unconfirmed benefit. For tax assumptions, use current official guidance and a qualified tax professional, not an old sales slide or a blanket percentage.


Red flag: The contract payment is due regardless, but the salesperson treats a conditional benefit as guaranteed money available to make it.


For a proposal using Illinois Shines, check the named Approved Vendor and installer/designee separately. Ask who submits the project and handles the incentive payment; program roles are not interchangeable.


☐ 14. Find out what “free” actually means


Request: For a lease or power purchase agreement, read the ownership, payment and annual escalation clauses. Ask for the full-term payment illustration, maintenance responsibilities and options at the end of the agreement.


Check: Find the provisions for a home sale, early termination and buyout. “No upfront payment” describes timing, not total cost. Compare the agreement’s obligations with the cash or loan alternative before deciding which arrangement fits your plans.


Red flag: The sales pitch says free, while the document creates years of payments or a rising electricity purchase rate.


The FTC warns about misleading solar sales pitches. A low upfront payment does not establish that a system costs nothing.


☐ 15. Keep time to review


Request: Request the complete unsigned installation and financing agreements, including exhibits. Read cancellation instructions, deadlines, deposit terms and change-order provisions before signing; applicable cancellation rights depend on the transaction and governing rules.


Check: Put promised discounts, equipment, completion milestones and exclusions in the agreement. If the seller claims a utility or program deadline, verify it with that organization rather than relying on the sales countdown.


Red flag: A supposedly final offer expires before you can read the documents, or an important promise is dismissed as something that need not be written down.


For the components that can change a quote, read our homeowner’s solar pricing guide.


Staff receive solar-system operating instruction beside wall-mounted inverters at Roseburg Readiness Center, Oregon.
Solar-system operating instruction at Roseburg Readiness Center, Oregon. Oregon Army National Guard photo by Staff Sgt. Anita Stratton; public domain. Illustrative image, not Fidelis personnel or work.

4. Know what happens after the sale


☐ 16. Assign permits and utility approval


Request: Ask for a written milestone list: design, permit submission, installation, inspection, utility interconnection and any required permission to operate. Assign each step to a named party and clarify which payment milestone depends on it.


Check: After installation, request the inspection result and applicable utility approval, not just photos of panels. Ask who handles corrections and utility questions. Weather and agency processing can cause delays; the contract should still make ownership of the next step clear.


Red flag: The job is called complete because the panels are on the roof, but nobody can identify who is finishing required approvals.


In Johnson County, a project inside city limits uses that city’s permit process; county-issued permits cover unincorporated addresses. Contractor licensing and the project permit are separate checks.


☐ 17. Separate the warranties


Request: Request the actual manufacturer and installer warranty documents, not a summary slide. Separate panel product coverage, performance coverage, inverter or battery coverage, workmanship, and roof-related obligations.


Check: For a failed inverter, ask who diagnoses it, submits the claim, pays freight, removes the old unit and installs the replacement. Equipment coverage does not by itself answer every labor or service-cost question. Read exclusions and transfer terms before comparing warranty lengths.


Red flag: A long panel-performance warranty is presented as if it covers every component and all service labor for the same period.


☐ 18. Identify the service contact


Request: Ask for the service phone or email, reporting procedure and any written response commitments. Find out whether monitoring is something you watch, something the installer actively watches, or a separately purchased service.


Check: Use a realistic scenario: the monitoring app shows no production on a sunny weekday. Who checks whether it is a communications problem or an equipment fault, and when might diagnostic charges apply? Ask for the answer in the service terms.


Red flag: Lifetime monitoring is promised, but nobody can explain who notices an alert or what action follows it.


☐ 19. Require a usable handoff


Request: Request a handoff package containing the installed equipment list, warranties, approved plans or available project records, inspection and utility approvals, and monitoring access. Store copies somewhere you control, rather than relying only on the salesperson’s inbox.


Check: Before closeout, sign into your own monitoring account and ask for an operating walkthrough. Know how to report a fault and where the written shutdown instructions are. Do not open electrical equipment or troubleshoot energized parts yourself.


Red flag: The project is marked finished while the homeowner still needs the installer’s login to see basic system information.


Our solar ownership handoff guide shows the records and access worth keeping together.


☐ 20. Discuss the next roof or home sale


Request: Read the agreement’s removal, reinstallation and transfer provisions before committing. Ask who coordinates roof work, which costs are excluded, and whether moving or replacing equipment affects warranties. Get future work priced when its scope is known rather than treating an early estimate as a guarantee.


Check: For a future sale, distinguish transferring an equipment warranty from transferring a loan, lease or PPA. Ask the relevant lender or agreement provider about its process and conditions. These are separate obligations, not one automatic handoff.


Red flag: You are told everything transfers for free, but nobody can point to the terms or identify who must approve the transfer.


If roof work is likely, use our roof replacement and solar handoff checklist before scheduling either crew.


Are solar panels worth it?


They can be if the design, utility math, and financing work for your home. Compare total cost, expected production, remaining utility charges, and how long you expect to own the house. If the numbers only work in the most optimistic scenario, get another quote before you sign.



Before you sign, get a second set of eyes


Contact Fidelis Renewables and tell us you’re comparing a solar quote. We can help you identify what’s included, what’s missing, and which questions to get answered in writing.


Do not include account numbers or signatures in your initial inquiry. Confirm review scope and document-sharing arrangements first.